The size of the sites that have been constructed and are currently in operation extend from small refrigeration chambers with a volume of 1.000 m3 up to large refrigeration complexes with a total volume of more than 200.000 m3.
The facilities are being used by commercial enterprises, service companies (3PL'S) specialising in managing refrigerated products and finally by industrial enterprises that store raw materials, intermediates and finished products in low temperatures.
Operating temperatures range from +18⁰C to -30⁰C Celsius. The mechanical installations are mainly central and depending on the application of the refrigerant, indirect cooling systems (glycol solutions cooled in a heat exchanger) or direct cooling systems using ammonia or freon are used.
For all cold stores built by FRIGOSTAHL, the company provides full technical support, with well trained and organized maintenance engineers, stock of spare parts and consumables, and on-line monitoring system that gives the ability to intervene to the installation and make adjustments, remotely, even from FRIGOSTAHL’s headquarters in Thessaloniki.
The above services are provided either at the customer's request or after a diagnosis of fault via the on-line monitoring system or, finally, by scheduled maintenance contracts.
Similar services are also provided for installations that weren’t built by FRIGOSTAHL, but their owners require a complete and hassle-free technical support solution.
























DIAMANTIS MASOUTIS S.A.
CENTRAL WAREHOUSES
2011 – KAVALARI, THESSALONIKI
Redesigning conventional spaces into cold stores and construction of a brand new refrigeration plant in an 11,630 m² building.
Additional work in the new warehouse building in Kavalari including complete electrical and fire supression system installation, lightning protection of warehouse-offices, construction of electromechanical networks in the surrounding area (water supply), additional electrical installations for the office building, fireproofing of the metal structures supporting the fireproof panels and construction of fire resistant surfaces.






TOLKA BROS Ο.Ε.
AGRICULTURAL GOODS PICKING UNIT
1999-2000 – KOPANOS, NAOUSA
Modernisation of the picking area and cold store.
Complete sealing and installation of Controlled Atmosphere system for 6 refrigeration chambers (Surface area 700 m², Refrigerated space volume 3,500 m3).
Complete refrigeration and general M & E equipment and installations.
2000-2001 – AGGELOCHORI, ERENOUPOLI
Modernisation of the refrigeration plant.


























HEAD LINKS LLC
FRUIT & VEGETABLE PROCESSING INDUSTRY
2017 – SHENDI CITY, NORTH SUDAN
FRIGOSTAHL S.A. completed all works related to the construction of a 10.000 tons cold storage, sorting and packing facility for potatoes and onions at Shendi City, North Sudan.
The facility includes a 7.900m² and 9,5m tall building. There are 8 cold storage rooms with a capacity of 1.300 tons each. In addition to this, there is also a sorting and packing building of 1.500m².
The building frame is made out of steel, with all roofs, ceilings and walls made of sandwich panels.
The mechanical equipment supplied and installed by Frigo Stahl includes 16 AHU that are connected to Freon operated water cooled condensing units. These AHUs are specific for potato and onion storage facilities, can provide demand based ventilation, heating or cooling and finally their operation is fully automated as they are controlled by a Programmable Logic Controller (PLC).
Sorting and packing of potatoes and onions is done by a fully automated sorting and packing line, of adequate capacity.
Frigo Stahl SA has also delivered the complete electrical and lighting installation as well as the required water supply pumps and piping for the operation of the AHU condensers.






























MAKIOS LOGISTICS
LOGISTICS CENTER – ΨΥΓΕΙΑ
2001 – KALOCHORI, THESSALONIKI
The project included complete construction of:
– Refrigeration chamber complex with a substantial height including a complete Logistics system for product import and export.
– Refrigeration chambers for product storage down to -28 οC with total surface area of 9.000 m2 and total volume of 80.000 m3
including building works, steel frame erections, PU sandwich panels, complete refrigeration and M & E installations.
2002 – KALOCHORI, THESSALONIKI
Complete construction of a perishable goods distribution complex with a complete Logistics system to be used as distribution centre by MAKRO S.A. CASH & CARRY, with total surface area of 2.600 m2 and refrigerated volume of 15.000 m3.
Project included building works, steel frame erections, PU sandwich panels, complete refrigeration and M & E installations.
2003 – KALOCHORI, THESSALONIKI
Complete construction of a storage fascility for perishable goods with optional air-conditioning and complete Logistics system. The total surface area of the complex is 2.500 m2 with a refrigerated space volume of 20.000 m3. Project included all building works, steel frame erection, PU sandwich panels, lighting and fire-suppression systems installations.
2004 – KALOCHORI, THESSALONIKI
Turnkey construction of a perishable goods distribution complex with a complete Logistics system with total surface area of 7.200 m2 and a refrigerated space volume of 60.000 m3. Project included building works, steel frame erections, PU sandwich panels, complete refrigeration and M & E installations.
2005 – KALOCHORI, THESSALONIKI
Configuration of existing space to fascilitate the packing of glucose with a total surface area of 420 m2. Project included building configuration with PU sandwich panels and floors with an industrial tile finish. Complete networks (steam, water) and electrical networks for the operation of the unit.
2006 – KALOCHORI, THESSALONIKI
Configuration of a fireproof space for the installation of the company’s computer server.


















VASSILIOU TROFINKO S.A.
MEAT, VEGETABLES AND FISH PRODUCTS PROCESSING AND PACKING UNIT
2004 – MAGOULA, ATTIKA
Configuration of existing refrigeration chambers with PU panels, installation of refrigeration doors and complete construction of a new refrigeration system.
Total refrigerated space volume: 25.700 m3










ALFA BETA VASSILOPOULOS S.A.
LOGISTICS CENTER – CENTRAL WAREHOUSES
2008 – SINDOS, INDUSTRIAL AREA OF THESSALONIKI
Configuration of new refrigerated spaces for hanging meat with the installation of air (ceiling) rails in the central warehouses of the company.
2009 – OINOFYTA, VIOTIA
Configuration of cold rooms and construction of a complete refrigeration installation at the company’s new Logistics center with a total surface area of refrigerated spaces of 22,500 m2.
2010 – OINOFYTA, VIOTIA
Additions and extensions to the refrigeration installation serving the logistics center in Oinofyta.
2010 – MANDRA, ATTICA
Extension of the refrigeration installation serving the vulnarable products handling area.
2011 – MANDRA, ATTICA
Extension of the refrigeration installation serving the vulnarable products handling area.


















































KATSIAMAKAS S.A.
FRUIT & VEGETABLE PACKING UNIT
2000 – ANTHEMIA, NAOUSA
Wall cladding and configuration of refrigeration chambers and sorting areas with PU sandwich panels in a building with an area of 17,000 m2. Complete insulation and installation of Controlled Atmosphere installation for 8 refrigeration chambers. Construction of seven degreening – artificial ripening chambers. Refrigeration chambers volume: 35,000 m3
Complete refrigeration and partial mechanical & electrical equipment and installations.
2007 – ANTHEMIA, NAOUSA
Facilities extension with the construction of a new building with a surface of 17,000 m2.
Complete construction including steel frame erection, sandwich panel installation, complete refrigeration, plumbing and partial mechanical & electrical installations.












KESIDIS BROS S.A.
WHOLESALE TRADE OF FOOD AND DRINKS
2000 – KOPANOS, NAOUSA
– Expansion of the refrigeration installation with the construction of new refrigeration chambers (surface area of 1.100 m2 and volume of 5.000 m3) specific for the storage of asparagus. Project included building works and complete steel frame erection for the buildings.
– Configuration of 5 refrigeration chambers and pre-chamber with PU sandwich panels.
– Conversion of existing chambers into Controlled Atmosphere chambers, complete replacement of the old refrigeration installation serving 11 refrigerated spaces with a new one, working with ammonia as a cooling medium (R717).
– Complete insulation and installation of Controlled Atmosphere system in 3 refrigeration chambers.
– Complete refrigeration and M & E equipment supply and installations.
2001 – KOPANOS, NAOUSA
– Construction of a deep freezing fascility with total surface area of 3.600 m2 and total volume of 10.200 m3.
– Complete steel frame building erection with roof coverings and wall cladding.
– Configuration of 6 refrigeration chambers and 2 pre-chambers with PU sandwich panels.
– Complete refrigeration and M & E supply of equipment and installations for the refrigeration chambers and the supply of the I.Q.F. freezer.




























POULIS S.A.
FRUIT PRODUCTION & TRADING
2007 – TIRNAVOS
Turnkey project with complete construction of a new fruit picking building (5.000 m2), controlled atmosphere cold storage chambers (15.900 m3) as well as building works, steel frame erection, panel installation, complete refrigeration, hydraulic and general M & E installations.
2008 – TIRNAVOS
Construction of 5 cold store chambers for precooling of delicate fruit and vegetables. Cooling capacity: 200 KWR




























MAKEDONIA COLD STORAGE S.A.
REFRIGERATION AND STORING OF FRESH FRUIT AND VEGETABLES
1999 – VERIA, IMATHIA
Complete construction of a brand new Controlled Atmosphere picking and refrigeration unit (Total area 2,300 m2 and volume of 6,300 m3) . Then, configuration of the existing picking facility into 5 refrigeration chambers and a pre-chamber with polyurethane panels as well as full waterproofing and air tightening for the installation of Controlled Atmosphere system for 4 additional refrigeration chambers. Project included all building works, steel frame erection of new buildings, complete refrigeration and M & E equipment supply and installations.
2004 – VERIA, IMATHIA
Expansion of the existing facilities by constructing a new building with eight refrigerated chambers with controlled Atmosphere technology (Total area of 1350 m2 and Total volume of 4,400 m3) with steel frame erection, panel mounting, complete refrigeration, hydraulic and M & E installations.
2015 – VERIA, IMATHIA
Construction of new refrigeration facilities (Total area of 2.175 m2) for fruit and vegetable maintenance.
The project included all required building works, construction of a new ammonia cooling plant within the under construction building, construction of a new ammonia cooling plant in the existing building (replacing an existing freon installation) and construction of a new controlled atmosphere installation together with sealing works of the cooling chambers. It also included installation of a fire detection and fire-suppression system, installation of a 800kVA substation and finally installation of a heat pump for heating the existing offices.
















LABRIDIS BROS S.A.
FRUIT & VEGETABLE PROCESSING UNIT
2008 – SKIDRA, PELLA
Turnkey project including: construction of a new 4,800 m2 building, with indoor configuration of cold store chambers, complete refrigeration, hydraulic and general M & E installations as well as water / steam and fire extinguishing networks. Additionally, it includes the construction of a biological cleaning fascility and redesign of the existing building to a production area.
2011 – SKIDRA, PELLA
Adaptation of the refrigeration installation, in order to allow for a cold storage chamber to operate in 2 refrigerant circuits.
2012 – SKIDRA, PELLA
Expansion of the existing frozen fruit refrigeration installation as well as construction of new ones.