dotsforbanner.1a

INDUSTRIAL FACILITIES

LOGISTICS

PROJECT OVERVIEW

STELIOS KANAKIS S.A.

CLIENT

ACHARNES, ATTICA, GREECE

LOCATION

FRIGO STAHL S.A.

DESIGN

FRIGO STAHL S.A.

CONSTRUCTION

7 MONTHS

CONSTRUCTION DURATION

STELIOS KANAKIS S.A.

Stelios KanakisStelios Kanakis entrusted us with the design and turnkey construction of a new industrial building of approximately 900 m² within its existing premises in Acharnes, Attica. The project comprises four new cold rooms, including freezer storage space, and a loading anteroom, a new refrigeration installation serving freezing, chilled storage and air conditioning, and refurbishment of the existing refrigeration installation. External works included ground-level adjustments to facilitate truck manoeuvring and loading and unloading operations.

KEY PROJECT HIGHLIGHTS

  • New industrial building of approximately 900 m², with four cold rooms and a loading anteroom.

  • New refrigeration installation and refurbishment of the existing system, without interruption of warehouse operations or temperature control.

  • CO₂ (R744) freezing system with ODP = 0 and GWP = 1.

  • External area adjustments for truck access and loading and unloading.

  • Turnkey delivery in 7 months. Investment targets: +40% storage capacity and −25% energy footprint.