PROJECT OVERVIEW
FOODLINK S.A. of FOOD AGENCIES AND DISTRIBUTION
CLIENT
ASPROPYRGOS, ATTICA
LOCATION
FRIGO STAHL S.A.
DESIGN
FRIGO STAHL S.A.
PROJECT CONSTRUCTION
4 MONTHS
DURATION
FOODLINK S.A. of FOOD AGENCIES AND DISTRIBUTION
FOODLINK S.A. commissioned FRIGO STAL S.A. to install a fully integrated air – conditioning system at the company’s warehouse in Aspropyrgos, with a total capacity of 600 KWR. Two independent climate-controlled zones were created, aiming to maintain a stable temperature of 18–20°C. The installation enhances energy efficiency while ensuring consistent storage temperatures and reducing the warehouse’s environmental footprint.Project Highlights
Installation of 2 THERMOCOLD glycol chillers with a 1.500 liter buffer tank
Installation of 24 GUENTNER heavy-duty air coolers
Use of 3 GRUNDFOS pumps
The project is fully aligned with the European Green Deal and the National Energy and Climate Plan (NECP)