PROJECT OVERVIEW

FOODLINK S.A. of FOOD AGENCIES AND DISTRIBUTION

CLIENT

ASPROPYRGOS, ATTICA

LOCATION

FRIGO STAHL S.A.

DESIGN

FRIGO STAHL S.A.

PROJECT CONSTRUCTION

4 MONTHS

DURATION

FOODLINK S.A. of FOOD AGENCIES AND DISTRIBUTION

FOODLINK S.A. commissioned FRIGO STAL S.A. to install a fully integrated air – conditioning system at the company’s warehouse in Aspropyrgos, with a total capacity of 600 KWR. Two independent climate-controlled zones were created, aiming to maintain a stable temperature of 18–20°C. The installation enhances energy efficiency while ensuring consistent storage temperatures and reducing the warehouse’s environmental footprint.

Project Highlights

  • Installation of 2 THERMOCOLD glycol chillers with a 1.500 liter buffer tank

  • Installation of 24 GUENTNER heavy-duty air coolers

  • Use of 3 GRUNDFOS pumps

  • The project is fully aligned with the European Green Deal and the National Energy and Climate Plan (NECP)