storage and distribution center

Makios: Double Potential Go Ahead

MAKIOS: DOUBLE POTENTIAL GO AHEADSOON THE SECOND PHASE OF THE INVESTMENT With significant investments in 2023 as well, MAKIOS LOGISTICS, a leading company in the 3rd Party Logistics industry and a member of the HIG group, intends to lead the developments in its industry. 20 days ago Makios’ last major investment in Attica was delivered.…

25 Years Frigo Stahl

2023 MARKS THE 25TH ANNIVERSARY OF FRIGO STAHLWe design. We build. We create. We deliver. We lead. What started 25 years ago as a small family construction business by a dedicated group of detail-oriented scientists has now evolved into a second-generation well established known and accepted construction company with broad acceptance for successfully delivering complex…

MAKIOS

ENGINEERINGSOLUTIONSPROJECT OVERVIEW MAKIOSCLIENTTHESSALONIKILOCATIONFRIGO STAHL S.A. / ENVITEC BIOGAS AGDESIGNFRIGO STAHL S.A. / ENVITEC BIOGAS AGPROJECT CONSTRUCTION7 MONTHSDURATIONMAKIOSConstruction of a biogas power plant in collaboration with a foreign company that specialises in renewable energy projects.Project HighlightsElectricity production capacity of 1MWRaw material capacity of 28,000 tn/yearEstimated daily production of biogas: 11.500 m<sup>3</sup>Construction of environmental infrastructure for the…

TYRAS

ENGINEERINGSOLUTIONSPROJECT OVERVIEW TYRASCLIENTTRIKALALOCATIONFRIGO STAHL S.A.DESIGNFRIGO STAHL S.A.PROJECT CONSTRUCTION8 MONTHSDURATIONTYRASConstruction of two 30m high self-supporting cold stores, where the shelves are the supporting structure of the whole building and the base for the refrigeration equipment. The construction is airtight to enable operations in a low oxygen environment, and eliminate fire hazards.Project HighlightsRefrigerated area volume ~ 115,000…

ARABATZIS

INDUSTRIAL CONSTRUCTIONSLOGISTICSPROJECT OVERVIEW ARABATZISCLIENTTHESSALONIKILOCATIONFRIGO STAHL S.A.DESIGNFRIGO STAHL S.A.PROJECT CONSTRUCTION10 MONTHS (NEW DEPARTMENT) – 4 MONTHS (RENOVATION OF EXISTING DEPARTMENTS)DURATIONARABATZISExpanding current facilities involves building a new industrial unit dedicated to dough product manufacturing, acquiring and installing new refrigeration equipment, integrating previous refrigeration areas into a modern ammonia cooling system, constructing tunnel freezer floors, and installing stainless…

MASOUTIS

COMMERCIALCONSTRUCTIONSPROJECT OVERVIEW MASOUTISCLIENTTHROUGHOUT THE COUNTRYLOCATIONCLIENT’S DESIGNDESIGNFRIGO STAHL S.A.PROJECT CONSTRUCTION2-3 MONTHSDURATIONMASOUTISFRIGO STAHL has completed Supermarket constructions with remodeling of existing buildings and complete construction of new stores. The projects included building works, electromechanical installations, underground parking and landscaping.Project HighlightsDemanding projects, mainly those of renovations as they were carried out piecemeal and during the night hours for…

AB BASILOPOULOS

COMMERCIALCONSTRUCTIONSPROJECT OVERVIEW AB BASILOPOULOSCLIENTTHROUGHOUT THE COUNTRYLOCATIONFRIGO STAHL S.A.DESIGNFRIGO STAHL S.A.PROJECT CONSTRUCTION2-3 MONTHSDURATIONAB BASILOPOULOSFRIGO STAHL has completed more than 80 Supermarket constructions with remodeling of existing buildings and complete construction of new stores. The projects included building works, electromechanical installations, underground parking and landscaping.Project HighlightsDemanding projects, mainly those of renovations as they were carried out piecemeal…

ARI S.A.

INDUSTRIAL CONSTRUCTIONSLOGISTICSPROJECT OVERVIEW ARICLIENTTHESSALONIKILOCATIONFRIGO STAHL S.A.DESIGNFRIGO STAHL S.A.ΚΑΤΑΣΚΕΥΗ ΜΕΛΕΤΗ16 MONTHSDURATIONARI S.A.Construction of an Industrial Building – Facilities for receiving, sorting and storing olives in ripening tanks, construction of a waste treatment facility, construction of a lagoon in the surrounding area, as well as a three-story office buildingProject HighlightsConstruction of buildings with a total area of…

MAKIOS

INDUSTRIAL CONSTRUCTIONSLOGISTICSPROJECT OVERVIEW MAKIOSCLIENTTHESSALONIKILOCATIONFRIGO STAHL S.A.DESIGNFRIGO STAHL S.A.PROJECT CONSTRUCTION10 MONTHSDURATIONMAKIOSConstruction of a distribution center with a complete logistics system including a railway connection.Project HighlightsTotal covered area of the complex was 15.000 m²Two-storey office section of 800 m²Complete landscaping works on a 55.000 m² plotConstruction of a railway network connection to the logistics center

JIMMY’S

INDUSTRIAL CONSTRUCTIONSLOGISTICSPROJECT OVERVIEW JIMMY’SCLIENTAIGINIOLOCATIONFRIGO STAHL S.A. + EXT. ARCHITECTDESIGNFRIGO STAHL S.A.PROJECT CONSTRUCTION7 MONTHSDURATIONJIMMY’SConstruction of a new industrial unit consisting of 20 cold stores, refrigerated corridors, loading areas as well as three-storey offices.Project HighlightsTotal covered area of the complex was 5.050 m²Two-storey office section of 750 m²Complete landscaping works on a 20.000 m² plotSupply and installation…