INDUSTRIAL CONSTRUCTIONS
LOGISTICS
PROJECT OVERVIEW
ARI S.A
CLIENT
INDUSTRIAL AREA OF LAKKOMA
LOCATION
FRIGO STAHL S.A.
DESIGN
FRIGO STAHL S.A.
PROJECT CONSTRUCTION
BETWEEN 2018 AND 2022
DURATION
ARI S.A
A sequence of industrial structures and amenities were constructed for olive processing and the manufacturing of standard foods and antipasti-style products.
Apart from the production structures, engineering facilities were erected to provide water, steam, and electricity, and the premises surrounding the enterprise were developed.
Following this, an office edifice, along with four sets of above-ground olive storage tanks and waste management facilities, were built.
Project Highlights
Construction of the 1st phase of the project in 100 days
Buildings with specifications for food processing
An elevated storage tank for olives, designed for easy inspection and cleaning
Several sewage networks and distinct reservoirs for the integrated handling of diverse waste streams