elevated storage tank for olives
dotsforbanner.1a

INDUSTRIAL CONSTRUCTIONS

LOGISTICS

PROJECT OVERVIEW

ARI S.A

CLIENT

INDUSTRIAL AREA OF LAKKOMA

LOCATION

FRIGO STAHL S.A.

DESIGN

FRIGO STAHL S.A.

PROJECT CONSTRUCTION

BETWEEN 2018 AND 2022

DURATION

ARI S.A

A sequence of industrial structures and amenities were constructed for olive processing and the manufacturing of standard foods and antipasti-style products.

Apart from the production structures, engineering facilities were erected to provide water, steam, and electricity, and the premises surrounding the enterprise were developed.

Following this, an office edifice, along with four sets of above-ground olive storage tanks and waste management facilities, were built.

Project Highlights

  • Construction of the 1st phase of the project in 100 days

  • Buildings with specifications for food processing

  • An elevated storage tank for olives, designed for easy inspection and cleaning

  • Several sewage networks and distinct reservoirs for the integrated handling of diverse waste streams