dotsforbanner.1a

INDUSTRIAL CONSTRUCTIONS

LOGISTICS

PROJECT OVERVIEW

OB STREEM

CLIENT

ASPROPYRGOS, ATTICA

LOCATION

FRIGO STAHL S.A.

DESIGN

FRIGO STAHL S.A.

PROJECT CONSTRUCTION

15 MONTHS

DURATION

OB STREEM

OB STREEM, one of the largest end-to-end logistics groups in Greece, entrusted us with the design and construction of a 20.000 m2 warehouse building, accommodating both dry storage and temperature controlled logistics. In the surrounding area, approximately 15.000 m2 of industrial flooring were constructed to support vehicle circulation and loading operations.

Project Highlights

  • Demolition and reuse of materials from the previous facility in the construction of the new building

  • Super flat floors designed for VNA (Very Narrow Aisle) operations

  • Temperature-controlled areas (deep-freeze storage, frozen picking areas and chilled storage)

  • Refrigeration machine room with two-stage ammonia system and 8 GEA compressors

  • Fire-fighting system with sprinklers compliant with EN standards

  • Construction of three Medium Voltage substations

  • Concrete floor construction for external loading areas (33 positions). Installation of a charging network for 100 refrigerated trucks.