production and cold room building.
dotsforbanner.1a

INDUSTRIAL CONSTRUCTIONS

LOGISTICS

PROJECT OVERVIEW

ARABATZIS

CLIENT

THESSALONIKI

LOCATION

FRIGO STAHL S.A.

DESIGN

FRIGO STAHL S.A.

PROJECT CONSTRUCTION

10 MONTHS (NEW DEPARTMENT) - 4 MONTHS (RENOVATION OF EXISTING DEPARTMENTS)

DURATION

ARABATZIS

Expanding current facilities involves building a new industrial unit dedicated to dough product manufacturing, acquiring and installing new refrigeration equipment, integrating previous refrigeration areas into a modern ammonia cooling system, constructing tunnel freezer floors, and installing stainless steel platforms and stairs within the freezer tunnels, all complemented by environmental landscaping.

In detail, the project encompassed installing a 4-stage ammonia refrigeration system (-42⁰C, -35⁰C, -10⁰C, 0⁰C) for 6 freezer tunnels.

Renovation works (floors, air conditioning, partitioning) of the existing production areas were also carried out.

Project Highlights

  • New production and cold room building of 5.375 m²

  • Holistic configuration of the surrounding area in a field of 20.000 m²

  • Demanding work program so as not to affect the operation of the rest of the unit

  • 4-stage ammonia cooling system

  • Integration of existing cooling rooms into the new ammonia cooling space network