INDUSTRIAL CONSTRUCTIONS
LOGISTICS
PROJECT OVERVIEW
ARABATZIS
CLIENT
THESSALONIKI
LOCATION
FRIGO STAHL S.A.
DESIGN
FRIGO STAHL S.A.
PROJECT CONSTRUCTION
10 MONTHS (NEW DEPARTMENT) - 4 MONTHS (RENOVATION OF EXISTING DEPARTMENTS)
DURATION
ARABATZIS
Expanding current facilities involves building a new industrial unit dedicated to dough product manufacturing, acquiring and installing new refrigeration equipment, integrating previous refrigeration areas into a modern ammonia cooling system, constructing tunnel freezer floors, and installing stainless steel platforms and stairs within the freezer tunnels, all complemented by environmental landscaping.
In detail, the project encompassed installing a 4-stage ammonia refrigeration system (-42⁰C, -35⁰C, -10⁰C, 0⁰C) for 6 freezer tunnels.
Renovation works (floors, air conditioning, partitioning) of the existing production areas were also carried out.
Project Highlights
New production and cold room building of 5.375 m²
Holistic configuration of the surrounding area in a field of 20.000 m²
Demanding work program so as not to affect the operation of the rest of the unit
4-stage ammonia cooling system
Integration of existing cooling rooms into the new ammonia cooling space network