PROJECT OVERVIEW

KONSTANTOPOULOS ΑΕ- OLYMP ΑΕ

CLIENT

3rd Km NATIONAL ROAD KATERINI-LARISSA, KATERINI

LOCATION

FRIGO STAHL S.A.

DESIGN

FRIGO STAHL S.A.

PROJECT CONSTRUCTION

7 MONTHS

DURATION

KONSTANTOPOULOS ΑΕ- OLYMP ΑΕ

konstantopoulos

“KONSTANTOPOULOS S.A.” entrusted FRIGO STAHL S.A. with the design and construction of an extension to its central warehouse at the olive processing plant, all while maintaining full operational capacity.

The 2,500m² expansion was planned and carried out in two phases to ensure seamless continuity of warehouse operations throughout the construction process.

Project Highlights

  • Excavation and foundations construction

  • Erection and cladding of the metal structure

  • Industrial flooring

  • Panel installation

  • Electromechanical & specialized installations (loading/unloading systems, fire protection, electrical works, etc.)