dotsforbanner.1a

INDUSTRIAL FACILITIES

LOGISTICS

PROJECT OVERVIEW

ASTRA CARGO & LOGISTICS

CLIENT

INDUSTRIAL AREA OF THESSALONIKI (Sindos)

LOCATION

FRIGO STAHL S.A.

DESIGN

FRIGO STAHL S.A.

CONSTRUCTION

5 MONTHS

CONSTRUCTION DURATION

ASTRA CARGO & LOGISTICS

ASTRA CARGO & LOGISTICSASTRA Cargo & Logistics entrusted us with the expansion of its existing freezer chamber at the Sindos Industrial Area. This turnkey project was designed around the company’s actual operational needs, with the objective of doubling its storage capacity. We delivered 700 m² of new refrigerated space.

KEY PROJECT HIGHLIGHTS

  • Turn-Key expansion of the existing freezer chamber, adding 700 m² of new refrigerated space and doubling storage capacity.

  • Construction carried out while the warehouse remained fully operational, with works phased to minimise disruption to logistics operations.

  • Thermal insulation performance above the minimum required standards, reducing thermal losses and the energy demand of the refrigeration system.