INDUSTRIAL CONSTRUCTIONS
LOGISTICS
PROJECT OVERVIEW
JIMMY’S
CLIENT
AIGINIO
LOCATION
FRIGO STAHL S.A. + EXT. ARCHITECT
DESIGN
FRIGO STAHL S.A.
PROJECT CONSTRUCTION
7 MONTHS
DURATION
JIMMY’S
Construction of a new industrial unit consisting of 20 cold stores, refrigerated corridors, loading areas as well as three-storey offices.Project Highlights
Total covered area of the complex was 5.050 m²
Two-storey office section of 750 m²
Complete landscaping works on a 20.000 m² plot
Supply and installation of required mechanical equipment to maintain the desired temperature inside the 20 cold stores, corridors and the expansion of the handling of goods area
Dynamically controlled atmosphere system for 17 cold stores
Construction of all necessary networks (refrigeration, electrical, plumbing) for the operation and control of the refrigeration system
Setup and commissioning of the installation