Construction of a new industrial unit
dotsforbanner.1a

INDUSTRIAL CONSTRUCTIONS

LOGISTICS

PROJECT OVERVIEW

JIMMY’S

CLIENT

AIGINIO

LOCATION

FRIGO STAHL S.A. + EXT. ARCHITECT

DESIGN

FRIGO STAHL S.A.

PROJECT CONSTRUCTION

7 MONTHS

DURATION

JIMMY’S

Construction of a new industrial unit consisting of 20 cold stores, refrigerated corridors, loading areas as well as three-storey offices.

Project Highlights

  • Total covered area of the complex was 5.050 m²

  • Two-storey office section of 750 m²

  • Complete landscaping works on a 20.000 m² plot

  • Supply and installation of required mechanical equipment to maintain the desired temperature inside the 20 cold stores, corridors and the expansion of the handling of goods area

  • Dynamically controlled atmosphere system for 17 cold stores

  • Construction of all necessary networks (refrigeration, electrical, plumbing) for the operation and control of the refrigeration system

  • Setup and commissioning of the installation