INDUSTRIAL CONSTRUCTIONS
LOGISTICS
PROJECT OVERVIEW
OLYMPOS
CLIENT
LARISSA
LOCATION
FRIGO STAHL S.A.
DESIGN
FRIGO STAHL S.A.
PROJECT CONSTRUCTION
6 MONTHS
DURATION
OLYMPOS
Expansion of existing facilities in Larissa through the construction of a new building including refrigeration and storage, office space, a chiller plant, and auxiliary areas with a total surface area of 8.900 m². The project includes innovative and automated robotic stretch wrapping and labelling machines.Project Highlights
Working alongside a foreign firm supplying the automated logistics system
Compliance with strict international construction standards
Operation of unmanned laser guided vehicles (LGVs)
Fully automatic robot palletising system
Bespoke software design, tailored to the customer’s needs
Air coolers were “insulated coolers”